Dilley Elementary Phase 1 (2024)
Phase 1 work comprised:
- Seismic retrofits, such as bracing and anchoring of walls to bring the building structure to "safe exit" standards
- Upgrades to the HVAC system to add air conditioning; fire safety and security systems; repaving of the rear blacktop and bus dropoff/pickup area
- Replacement of exterior siding and roofing
Aug. 20, 2024 - Exterior Work, Wrapping Up Inside
Aug. 14, 2024 - Finalizing Finishes, Painting
Aug. 7, 2024 - Finishes Applied
July 31, 2024 - Finishes, HVAC, Systems, Painting
July 22, 2024 - Seismic Upgrades, New Siding
July 16, 2024 - Ongoing Construction
July 10, 2024 - Roofing Completed, Remodeling and Reinforcement Continue
July 3, 2024 - Roofing, Painting, Prep for Next Round
June 28, 2024 - Seismic Work Continues
June 28, 2024 - Gallery of Seismic Work
June 25, 2024 - Roofing, Seismic Work
June 18, 2024 - Summer Remodeling Begins